Bathroom · Amsterdam

Terracotta under the skylight

A complete new bathroom in Amsterdam, from bare shell to handover. After demolition the ceiling was insulated, the pipework renewed and the walls rebuilt. Terracotta tiles in the walk-in shower and behind the toilet, a tiled dividing wall, a skylight for plenty of daylight, recessed spotlights and a floating vanity unit with a tall cabinet in dark wood.

Location
Amsterdam
Type
Bathroom
Size
compact bathroom (5–7 m²)
Duration
3–5 weeks
Work carried out
Demolition · Ceiling insulation and skylight · Pipework and drainage · Tiling · Walk-in shower with rain shower · Custom furniture

About this project

The starting point

The existing bathroom under the skylight was replaced completely. Everything had to fit into a compact space: a walk-in shower, a wall-hung toilet, a washbasin and enough storage. We stripped the room back to the shell and rebuilt it step by step.

How we did it

  1. Demolition – tiles, sanitary ware and old pipes removed, until only the bare room under the skylight remained.
  2. Ceiling – insulated and finished with moisture-resistant boards. Warm, humid air condenses quickly under a skylight; this keeps the ceiling dry.
  3. Plumbing and drainage – fully renewed and laid in the right place for the shower, toilet and washbasin.
  4. Walls – rebuilt, with a tiled partition wall separating the shower from the rest of the room.
  5. Tiling and finishing – terracotta tiles in the walk-in shower and behind the toilet, a niche in the shower wall, recessed spotlights and installation of the sanitary ware.

The result

Daylight falls from above onto the warm terracotta. The rain shower, the wall-hung toilet and the floating vanity unit with a tall cabinet in dark wood keep the floor clear: the room looks bigger and is easy to clean.

How long does a bathroom like this take?

A bathroom of 5 to 7 m², like this one, takes us 3 to 5 weeks, from demolition to handover. Without delays we usually finish within 3 to 4 weeks. The exact time depends on material deliveries and drying times, for example of plaster and tile adhesive.

More about our approach: bathroom renovation.

Photos of the result

Walk-in shower, toilet and washbasin under the skylightVanity unit and tall cabinet in dark woodWalk-in shower with rain shower and nicheWall-hung toilet against the terracotta wallBasin on a floating vanity unit

Before and after

Before — From bare shell to new bathroomAfter — From bare shell to new bathroom
From bare shell to new bathroom

Demolition

Bare room under the skylightWalls stripped, old pipes removed

Tiling

Moisture-resistant ceiling boards, first tilesTiling the dividing wall

Planning work on your home?

Request a free site visit. We come by, think along with you and you receive a clear quote. Response within one working day.

WhatsApp Floors