Bathroom with double washbasin
A complete bathroom renovation: from 3D design and demolition to a calm bathroom with travertine-look wall tiles, two basins, illuminated mirrors, a walk-in shower with rain shower and built-in niches with LED lighting.
- Type
- Bathroom
- Duration
- 3–5 weeks
- Work carried out
- 3D-ontwerp · Demolition · Pipework · Waterproof build-up · Tiling · Niches with LED lighting · Sanitary ware
About this project
The starting point
This bathroom started with a 3D design. That way it was clear in advance how the double washbasin, the walk-in shower and the illuminated niches would turn out, before anything was demolished.
How we did it
- 3D design – layout, tiles and lighting worked out and discussed in advance.
- Demolition – the old bathroom and toilet completely removed.
- Build-up – ceiling and walls rebuilt, pipework installed and the shower prepared.
- Tiling – travertine-look wall tiles, with niches fitted with LED lighting.
- Installation – two basins with illuminated arched mirrors, rain shower, wall-hung toilet and a recessed toilet roll holder.
Why a 3D design?
On a floor plan it is hard to see how tiles, niches and light work together. With a 3D design you make those choices in advance, so less needs to change during construction.
The result
A calm, bright bathroom where two people can use the washbasin at the same time. The toilet is finished in the same style, with its own illuminated niche.
How long does it take?
From demolition to handover, a bathroom like this takes 3 to 5 weeks. Without delays in deliveries and drying times we usually finish within 3 to 4 weeks.