Bathroom · Amsterdam

Green herringbone and warm copper

A new bathroom in Amsterdam. The old bathroom was completely stripped out, the pipework renewed and the room rebuilt. A walk-in shower with green herringbone tiles and an illuminated niche, a wall-hung toilet, a dark wood vanity unit and copper-coloured taps. Light, calm and easy to keep clean.

Location
Amsterdam
Type
Bathroom
Size
compact bathroom (5–7 m²)
Duration
3–5 weeks
Work carried out
Demolition · Pipework and drainage · Frame wall and concealed cistern · Herringbone tiling · Walk-in shower with illuminated niche · Sanitary ware and vanity installation

About this project

The starting point

The old bathroom was completely demolished. During demolition we opened up the walls, exposing the old pipework so it could all be replaced in one go.

How we did it

  1. Demolition – tiles, sanitary ware and walls removed; pipes exposed.
  2. Plumbing – new supply and drain pipes, with the water supply renewed from the water meter.
  3. False wall – a new wall with a concealed cistern for the wall-hung toilet, with all pipes neatly hidden.
  4. Tiling – green tiles in a herringbone pattern in the walk-in shower, with an illuminated niche.
  5. Installation – wall-hung toilet, vanity unit in dark wood and copper-coloured taps.

Why herringbone in the shower?

A herringbone pattern takes more cutting and precision than straight tiling, but it gives a small shower depth and movement. Combined with dark wood and copper, it creates a warm, calm atmosphere.

The result

A bright bathroom that invites you in straight from the hallway. Thanks to the wall-hung toilet the floor stays clear and everything is easy to clean.

Planning

For a bathroom of 5 to 7 m², allow 3 to 5 weeks. How fast it goes depends mainly on the delivery time of tiles and sanitary ware and on how quickly the substrate and adhesive dry. If everything goes to plan, the bathroom is usually ready after 3 to 4 weeks.

More about our approach: bathroom renovation.

Photos of the result

Walk-in shower with illuminated nicheWall-hung toilet and dark wood vanity unitView from the hallway

Before and after

Before — From demolition to new bathroomAfter — From demolition to new bathroom
From demolition to new bathroom

Demolition and pipework

Old wall opened up, pipes exposedNew pipework at the water meter

Build-up and tiling

Frame wall with wall-hung toilet

Planning work on your home?

Request a free site visit. We come by, think along with you and you receive a clear quote. Response within one working day.

WhatsApp Floors