Two bathrooms in one home
Two new bathrooms in the same home. The first with a walk-in shower, a custom wood-look vanity unit and a round illuminated mirror. The second with a bathtub, a wood-look tiled floor and a custom vanity unit.
- Type
- Bathrooms
- Duration
- 3–5 weeks per bathroom
- Work carried out
- Demolition · Pipework · Tiling · Walk-in shower · Bathtub · Custom furniture
About this project
The starting point
Two bathrooms were renewed in this home, each with its own layout: one with a walk-in shower, the other with a bathtub.
How we did it
- Demolition and plumbing – both bathrooms stripped and fitted with new pipework.
- Bathroom with walk-in shower – a floor with a drainage channel, then the wall tiles and the finishing of the walls.
- Bathroom with bathtub – pipework and floor, the bath installed and the walls prepared for tiling.
- Tiling – a wood-look tiled floor in the second bathroom.
- Custom work – made-to-measure vanity units, a round illuminated mirror and a custom cabinet next to the radiator.
Two bathrooms, two characters
The bathroom with the walk-in shower is open and bright, with a glass shower wall. The bathroom with the bathtub gets extra warmth from the wood-look tiled floor.
Planning
Allow 3 to 5 weeks per bathroom. How long it takes exactly depends on the delivery of tiles, sanitary ware and custom furniture, and on drying times.
More about our approach: bathroom renovation.