★★★★★ Rated 5.0 on Google Response within one working day · 020 261 7124 · info@mvbouw.nl
Bathroom

Terrazzo and wood

A bathroom stripped right back to the structure and rebuilt: insulation, new pipework, terrazzo tiling, a shower with glass screen and a custom wooden cabinet that warms up the whole space.

Type
Bathroom
Duration
3–5 weeks
Work carried out
Demolition · Insulation · Pipework · Terrazzo tiling · Custom woodwork

About this project

The starting point

This bathroom was taken right back to the structure and then rebuilt.

How we did it

  1. Demolition – everything removed until only the bare structure remained.
  2. Insulation and plumbing – the room insulated and fitted with new pipework.
  3. Custom work – a made-to-measure wooden cabinet built.
  4. Tiling and plastering – terrazzo tiles, with plaster above the tiles.
  5. Installation – shower with glass wall, washbasin with wooden unit and the cabinet doors.

Why terrazzo and wood?

Terrazzo has a lively pattern on which splashes and limescale are less visible. The wood adds warmth, so the bathroom looks calm without feeling cold.

Planning

Even when we go back to the structure, as here, we allow 3 to 5 weeks for a bathroom. Delivery times of tiles and custom work and the drying times determine where it lands within that range.

More about our approach: bathroom renovation.

Photos of the result

Complete bathroom with wood accentsWashbasin with wooden vanity unitShower glass and terrazzo

Before and after

Before — From structure to complete bathroomAfter — From structure to complete bathroom
From structure to complete bathroom

From demolition to finishing

Back to the structureInsulation and pipeworkBuilding the wooden cabinetTiling in progressPlastering above the tilesFitting cabinet doors

Planning work on your home?

Request a free site visit. We come by, think along with you and you receive a clear quote. Response within one working day.

WhatsApp