Terrazzo and wood
A bathroom stripped right back to the structure and rebuilt: insulation, new pipework, terrazzo tiling, a shower with glass screen and a custom wooden cabinet that warms up the whole space.
- Type
- Bathroom
- Duration
- 3–5 weeks
- Work carried out
- Demolition · Insulation · Pipework · Terrazzo tiling · Custom woodwork
About this project
The starting point
This bathroom was taken right back to the structure and then rebuilt.
How we did it
- Demolition – everything removed until only the bare structure remained.
- Insulation and plumbing – the room insulated and fitted with new pipework.
- Custom work – a made-to-measure wooden cabinet built.
- Tiling and plastering – terrazzo tiles, with plaster above the tiles.
- Installation – shower with glass wall, washbasin with wooden unit and the cabinet doors.
Why terrazzo and wood?
Terrazzo has a lively pattern on which splashes and limescale are less visible. The wood adds warmth, so the bathroom looks calm without feeling cold.
Planning
Even when we go back to the structure, as here, we allow 3 to 5 weeks for a bathroom. Delivery times of tiles and custom work and the drying times determine where it lands within that range.
More about our approach: bathroom renovation.