Terracotta accents
A bathroom with character: a chequered floor in terracotta and white, a custom red built-in cabinet, a washbasin with illuminated mirror and a neatly finished shower corner. From demolition to the last sealant joint.
- Type
- Bathroom
- Duration
- 3–5 weeks
- Work carried out
- Demolition · Wall build-up · Tiling · Plastering · Custom cabinet · Installation
About this project
The starting point
This bathroom was renewed from demolition to the last sealant joint and finished with a bold mix of terracotta, white and red.
How we did it
- Demolition – the walls opened up and the old finish removed.
- Build-up – new wall cladding, the shower corner built up and the connections for the washbasin installed.
- Tiling – a chequered floor in terracotta and white, with reinforcement for a solid base.
- Plastering and custom work – sanitary ware and tiles protected, the walls plastered and the red built-in cabinet made to measure.
- Installation – shower glass, washbasin with illuminated mirror and toilet.
The result
A bathroom with character, where the chequered floor and the red cabinet set the tone. The built-in cabinet provides storage without separate furniture.
How long does a bathroom like this take?
We complete a bathroom like this in 3 to 5 weeks. Without delays in deliveries or drying times it usually takes 3 to 4 weeks.
More about our approach: bathroom renovation.